Risks

Project risk matrix: how to build and use a probability and impact matrix

By José Roberto LimaNov 20, 20262 min read
Chess pieces on the board

Every project has risks, but not every project manages risks. In many cases, the risk list is filled in at kickoff, sits untouched in a spreadsheet and is only remembered when one of them has already become an issue. The probability and impact matrix helps decide which risks deserve attention now and which can simply be monitored.

How to write a risk

A well-written risk has three parts: cause, event and consequence. Compare "supplier delay" with "because the equipment supplier has only one factory (cause), delivery may be delayed (event), which would push back installation by up to three weeks (consequence)". The second version shows where to act and what is at stake.

How to build the matrix

  1. Define the scales: probability and impact in levels, for example from very low to very high, with a description for each level.
  2. Describe impact in project terms: how many days of delay, how much cost or what part of the scope each level represents.
  3. Combine the scales: crossing probability and impact sets the severity of each risk.
  4. Define the action bands: from what severity a risk requires an immediate response and when monitoring is enough.
  5. Use the same matrix on every project: only then can the PMO compare risks across projects.

Threats and opportunities

Risk is not only what can go wrong. An opportunity, such as bringing a deliverable forward because a team became available, is also an uncertain event that deserves analysis. That is why many companies use two matrices: one for threats and one for opportunities.

Risk responses

  • For threats: avoid, transfer, mitigate or accept.
  • For opportunities: exploit, share, enhance or accept.

Every response needs an owner and a date. Without them, the response plan is just an intention.

How it works in OnePlanner

Risks are logged inside the project itself, with cause, event and consequence. OnePlanner has threat and opportunity matrices, responses with an owner and a risk map to see where each one stands. Risks also feed into the project health calculation and the risk report in the Report Center, so the PMO sees the most serious ones across the whole portfolio.

Project risk map and register in OnePlanner

See how it works in OnePlanner: risk management.

Book a demo and see the OnePlanner risk matrix and map with sample data.

Frequently asked questions

What is the ideal size for the matrix?

Scales of three to five levels are the most common. What matters is that each level has a clear description and that every project uses the same scale.

How often should risks be reviewed?

At every project status meeting and whenever something relevant changes. A risk that is not reviewed loses its usefulness.

Do risks affect project health in OnePlanner?

Yes. Risks are one of the dimensions of the health calculation, alongside schedule, cost, scope, changes and issues.