Skip to content
OnePlanner
Menu

Projects

Waterfall, agile or hybrid project management

Each project is managed in the tool that makes sense for it: OnePlanner itself, Microsoft Project, Planner Premium, Jira, Azure DevOps or another integrated tool. All of them get the same records, the same summary of schedule, work, cost and progress, and the same indicators.

Microsoft Project, Planner, Jira, Azure DevOps and other tools in the same portfolio

Benefits

Each team works its own way, with the same record and the same indicators for every project.

The right tool for each project

Construction in Microsoft Project, a campaign in Planner, software in Jira or Azure DevOps, a corporate project in OnePlanner. Nobody needs to switch tools.

Full schedule in the browser

WBS, dependencies, critical path and baselines with nothing to install, with the company calendars and each person's calendar.

One change, every view

Grid, board, Gantt, calendar and reports read the same data. What changes in one view shows up in all of them.

Everything about the project in one place

Risks, changes, issues, costs, team, documents and meeting minutes live in the project itself, not in scattered spreadsheets.

Gantt with critical path and baseline

Waterfall projects

What the schedule shows

  1. WBS and dependencies with task numbering and the links between tasks in the schedule.
  2. Critical path highlighted in one click, to know where a delay changes the finish date.
  3. Baselines to compare the approved plan with the current forecast and measure the variance.
  4. Project tool shows where it is managed: OnePlanner, Project, Planner, Jira, Azure DevOps or another tool.

Agile projects

Agile management on boards

Plan iterative work and track tasks on boards: cards by status, bucket, assignee, priority or label, with drag and drop and due-date filters. Labels, buckets and checklists work as they do in Planner, so the team gets started without long training.

  • Cards by status, bucket, assignee or priority
  • Drag and drop
  • Same data as the schedule
Kanban board grouped by status

Microsoft Project

Those who prefer Microsoft Project stay in Project

The connector opens the schedule in Project Desktop. People edit as they always have, review a preview of the changes and publish back, and OnePlanner recalculates and keeps the portfolio up to date. Existing schedules come in through Project XML import, with files of up to 50 MB and up to 20,000 tasks.

  • Editing in Project Desktop with a preview of the changes
  • Schedule import in Project XML
Schedule opened in Microsoft Project and published back to OnePlanner, with a preview of the changes

Integrations

Planner, Jira and Azure DevOps projects in the same place

Teams that work in Planner Premium, Jira or Azure DevOps keep the tool they already use. The project enters OnePlanner with the same records as the others and gets health, costs, risks and reports like any other company project.

OnePlanner at the center, integrated with Microsoft Project, Planner, Jira, Azure DevOps and other tools

Complete project

Everything the project needs, in the same place

  • Health from 0 to 100: schedule, cost, scope, risks, changes and issues assessed with the same rules for every project
  • Risks, changes and issues: logging, impact analysis and action tracking inside the project
  • Costs: planned cost, budget and actual, with labor calculated from rate tables
  • Team and allocation: who works on the project and how much they are allocated across all projects
  • Documents: a SharePoint site per project, with document templates
  • Meeting minutes and status report: meetings synced with Outlook and Teams and a status report with the indicators already filled in

Frequently asked questions

Projects in OnePlanner.

Can waterfall and agile projects be in the same portfolio?

Yes. Each project uses the method and tool that make sense for it, and they all appear together in the portfolio, with the same indicators.

Do I need Microsoft Project installed?

No. The full schedule works in the browser. Project Desktop is optional, for those who prefer to plan in it.

Can I bring in the schedules I already have?

Yes. Import accepts Project XML files of up to 50 MB with up to 20,000 tasks, and Planner Premium plans can be brought into OnePlanner.

Blog

Go deeper on the topic

All articles

Discover OnePlanner

Schedule a demo. We show the platform with sample data similar to your company's and answer your PMO's and IT's questions.