OnePlanner implemented in the IT area in about 30 days

How Arteris's IT area implemented OnePlanner in about 30 days, with control of risks, changes and issues.

Client
Arteris
Industry
Infrastructure and logistics (highway concessions)
Solution
OnePlanner
Implementation
ProjectSA

Challenge

IT was looking for a project management tool with simple, fast implementation.

What was done

OnePlanner implemented in IT, with Power BI reports and a trained team.

Result

OnePlanner in use in IT in about 30 days, with risks, changes and issues in the same tool.

The scenario

Arteris specializes in highway management, with concessions in Brazil's South and Southeast. The IT area was looking for a tool to manage its projects, with three requirements:

Simple, fast implementation
Complete project management features
Control of risks, changes and issues

How ProjectSA solved it

  1. 1

    Build on what the company was already adopting

    At the same time, ProjectSA was migrating Arteris's engineering area to OnePlanner, and IT decided to use the same solution.

  2. 2

    Implement OnePlanner in IT

    No migration: ProjectSA implemented OnePlanner in the IT area in about 30 days.

  3. 3

    Build the Power BI reports

    Power BI reports were built to track the projects.

  4. 4

    Train the team

    The team was trained on the new platform.

Results

TimingOnePlanner implemented in the IT area in about 30 days.
Risks, changes and issuesControlled in the same tool as the IT projects.
Power BIPower BI reports to track the projects.
TeamTrained on the new platform.